NOV-DEL100 Daytime EL Inspection System

 Electroluminescence inspection in full daylight. Captures a whole 1500 V string in under 30 seconds at 100,000 lux, with AI defect recognition and automatic reports. No shading tent, no night shifts.

Traditional EL inspection means night work or bulky shading tents. The NOV-DEL100 changes that. Its 40-megapixel infrared camera and patented full-band optical filtering capture string-level EL images in direct midday sun of up to 100,000 lux, without disconnecting modules or shutting the plant down. Built-in AI corrects exposure, removes noise, then identifies and grades 12 types of defect in under 3 seconds and produces a standardised report with module-level location. A conventional night mode is also available.

Key features

1    True daytime EL: works in direct sun up to 100,000 lux; no shading tent, no shutdown, night mode also available

2    Fast: a whole string in ≤ 30 s, about 4× faster than night-time EL

3.   40 MP infrared imaging: continuous autofocus, defects visible down to 0.1 mm

4    AI defect recognition: 12 defect classes graded automatically, with standardised reports

5    Integrated power supply: 0–1500 V programmable, drives 1–4 strings at a time, fully protected

6    Long battery life: 20 Ah lithium battery, 800+ modules per charge

Specifications

ParameterValue
Camera40 MP infrared, custom lens, continuous autofocus
Defect resolutionDown to 0.1 mm
Ambient lightUp to 100,000 lux (direct midday sun); night mode available
Optical filteringPatented full-band IR filtering with adaptive denoising
Test time≤ 30 s per string
Image analysis≤ 3 s per string, AI-based
Defect classes12 (micro-cracks, broken fingers, fragments, poor soldering, PID and more)
System compatibility1500 V string systems
Power supply output0 – 1500 V, programmable constant current, ±0.1% current accuracy
Strings powered simultaneously1 – 4
Battery20 Ah high-rate lithium, 800+ modules per charge
ProtectionOver-current, over-voltage, reverse polarity
Mounting3 m carbon-fibre mast
ReportingStandardised PDF report with module location; cloud sync
CertificationCE

Applications

  • Commissioning and final acceptance of new PV plants
  • Post-transport, post-installation and post-storm damage assessment
  • Routine O&M inspection without night shifts
  • Module quality audits, sampling inspections and warranty claims
-7821512

Whether you’re planning a commercial project or looking to become a partner, our team is ready to help with system sizing, quotations and technical support.   Email :in@novenergy.cn

Scroll to Top